The Herbert Hoover Dike modification is located in Lake Okeechobee, Florida. The C-5 construction project consisted of a new cast-in-place reinforced concrete structure. The structure included cast in place foundations and walls for the Headwalls and three encased 10-ft diameter steel-lined culvert barrels.
17787 Okeechobee Rd,
Fort Pierce, FL 34945
Email. Justin@integcrete.com